IMPROVING NETWORK-BASED CALENDAR SCHEDULING IN CONSTRUCTION WORK PLANNING

Authors
  • Abdurakhmanov Ulugbek Arabdjon ogli

    PhD, Senior Lecturer, Fergana State Technical University

    Author

  • Rasuljon Khamitov Khasanjon ogli

    Assistant Teacher, Fergana State Technical University

    Author

Keywords:
Construction, planning, Gantt charts, linear schedules, network schedules, calendar plans, management, sequencing, model.
Abstract

In this article, the significance of network-based scheduling in the planning of contemporary construction works is examined, methods for improving such schedules are analyzed, and, based on the results obtained, recommendations are developed for their wide-scale practical application in accordance with construction norms and regulations, along with several specific proposals.

Downloads
Published
2025-12-18
Section
Articles
License
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

How to Cite

IMPROVING NETWORK-BASED CALENDAR SCHEDULING IN CONSTRUCTION WORK PLANNING. (2025). Eureka Journal of Civil, Architecture and Urban Studies, 1(2), 10-18. https://eurekaoa.com/index.php/8/article/view/70

Most read articles by the same author(s)

Similar Articles

You may also start an advanced similarity search for this article.