IMPROVING NETWORK-BASED CALENDAR SCHEDULING IN CONSTRUCTION WORK PLANNING

Authors

  • Abdurakhmanov Ulugbek Arabdjon ogli PhD, Senior Lecturer, Fergana State Technical University Author
  • Rasuljon Khamitov Khasanjon ogli Assistant Teacher, Fergana State Technical University Author

Keywords:

Construction, planning, Gantt charts, linear schedules, network schedules, calendar plans, management, sequencing, model.

Abstract

In this article, the significance of network-based scheduling in the planning of contemporary construction works is examined, methods for improving such schedules are analyzed, and, based on the results obtained, recommendations are developed for their wide-scale practical application in accordance with construction norms and regulations, along with several specific proposals.

Downloads

Published

2025-12-18

Issue

Section

Articles

How to Cite

IMPROVING NETWORK-BASED CALENDAR SCHEDULING IN CONSTRUCTION WORK PLANNING. (2025). Eureka Journal of Civil, Architecture and Urban Studies, 1(2), 10-18. https://eurekaoa.com/index.php/8/article/view/70

Most read articles by the same author(s)