JUSTIFICATION OF SHORT-HOLE DRILLING PARAMETERS TO IMPROVE THE EFFICIENCY OF SELECTIVE MINING IN OPEN-PIT GOLD DEPOSITS
- Authors
-
-
Mukhiddinov Khusniddin Oybek ugli
Master’s Degree Student, Department of Mining Engineering, Tashkent State Technical University (TSTU)
Author
-
Khalmatov Doston Qahramon ugli
Master’s Degree Student, Department of Mining Engineering, Tashkent State Technical University (TSTU)
Author
-
- Keywords:
- Open-pit mining, gold deposit, selective mining, short-hole drilling, drilling and blasting operations, ore loss, geological boundaries, mining efficiency, drilling parameters.
- Abstract
-
Accurate extraction of mineral resources within defined ore boundaries and the reduction of ore losses are among the key factors influencing the economic efficiency of open-pit gold mining operations. In deposits characterized by complex geological structures and variable ore boundaries, conventional drilling and blasting technologies may result in the loss of valuable ore and its mixing with surrounding waste rock. This, in turn, negatively affects ore recovery and the overall economic performance of mining enterprises.
- References
-
1.Rossi, M.E., & Deutsch, C.V. (2013). Mineral Resource Estimation. Dordrecht: Springer.
2.Afonseca, A., & Miguel-Silva, M. (2022). Review of drillhole spacing optimization methodologies for mineral resource estimation. Mining, 2(3), 345–362.
3.Englund, E., & Heravi, N. (1993). Optimization of drillhole spacing through conditional simulation techniques. Mathematical Geology, 25(7), 877–892.
4.Li, W., Tolmay, L., & Macfarlane, A. (2004). Determination of optimal drillhole spacing for resource classification using estimation error analysis. Journal of the Southern African Institute of Mining and Metallurgy, 104(6), 345–352.
5.Koppe, J.C., Costa, J.F.C.L., & Costa, M. (2011). Drillhole spacing optimization based on uncertainty analysis in mineral deposits. International Journal of Mining Science and Technology, 21(4), 557–563.
6.Usero, G., Ortiz, J.M., & Emery, X. (2019). Quantifying uncertainty for drillhole spacing optimization in mining projects. Mathematical Geosciences, 51(5), 613–630.
7.Drumond, G.A., Costa, J.F.C.L., & Souza, L.E. (2020). Geostatistical approach for drillhole spacing optimization in mineral resource evaluation. Mining Technology, 129(3), 143–154.
8.Verly, G., Postolski, M., & Costa, J.F.C.L. (2014). Quantile-based uncertainty measures for mineral resource assessment. Natural Resources Research, 23(4), 411–424.
9.Boucher, A., Dimitrakopoulos, R., & Vargas-Guzman, J.A. (2005). Joint optimization of drilling and mining decisions under uncertainty. Mining Technology, 114(2), 95–103.
10.Parker, H.M. (2012). Reconciliation Principles for the Mining Industry. Perth: AusIMM.
11.Journel, A.G. (2018). Pitfalls and advances in mineral resource estimation and mine reconciliation. Mathematical Geosciences, 50(8), 955–975.
12.Groeneveld, B., Topal, E., & Dowd, P. (2012). Improving mine planning through reconciliation and adaptive mining strategies. Mining Technology, 121(3), 155–166.
- Downloads
- Published
- 2026-06-09
- Issue
- Vol. 2 No. 6 (2026)
- Section
- Articles
- License
-

This work is licensed under a Creative Commons Attribution 4.0 International License.
How to Cite
Most read articles by the same author(s)
- Mukhiddinov Khusniddin Oybek ugli, Shonanov Oybek Shokhimardon ugli, DEVELOPMENT OF AN ALGORITHM FOR INTEGRATED MINING EQUIPMENT MANAGEMENT AND DATA TRANSMISSION TO A FLEET MANAGEMENT SYSTEM PLATFORM BASED ON ARTIFICIAL INTELLIGENCE AND VIDEO ANALYTICS , Eureka Journal of Geoscience, Materials & Resource Engineering: Vol. 2 No. 6 (2026)








